Precautions for processing molybdenum targets
Choose the appropriate processing method: There are various processing methods for molybdenum targets, such as forging, rolling and stretching. During forging, the temperature should be between 1200℃-2100℃, and the most suitable forging temperature is 1500℃-1800℃. Pay attention to the uniformity of temperature and force to avoid uneven problems caused by overheating.
Optimize sintering process parameters: In the preparation process of molybdenum targets, sintering is a key step. By adjusting parameters such as sintering temperature and pressure, the sintering quality and speed of molybdenum targets can be improved.
Ensure the purity of the processing environment: The processing of molybdenum targets should be carried out in a vacuum environment or an inert gas protection environment to avoid the occurrence of oxidation reactions. This not only improves the processing quality, but also ensures the purity of the final product.
Main parameters of molybdenum target
| Density | 10.28g/cm3 |
| Color | Metallic Luster |
| Purity | Mo:> =99.95% |
| Application | PVD coating film in glass industry , ion plating |
| Advantage | High Temperature Resistance, High Purity, Better Corrosion Resistance |
Molybdenum target product pictures display


Our advantages
1. Competitive prices
2. Strong R&D team
3. Production process control management
4. Implementation of continuous improvement covering production, sales and customer service.
FAQ About ZhenAn
Q:Not sure what kind of metal material is needed?
A: Please tell us about the use of materials, and we will give you referencesuggestions according to different material characteristics.
Q: Do you provide test reports?
A: Yes, we provide third-party test reports. If a third party is specified, additional fees will be charged.
Q: What payment methods are accepted?
A: Accept the following payment methods: T/T, L/C, D/A, D/P, Western union, Moneygram, etc. Other payment methods can be negotiated.
Q: How long can it take to deliver?
A: After confirming the order and receiving the advance payment, it can be shipped within 5-30 days. If it is a special customized product, the delivery time needs to be communicated.









