Process management of nickel flanges
Equipment calibration: Ensure that the nickel flange processing equipment is in good condition, and perform regular calibration and maintenance to ensure processing accuracy and stability. Operation specifications: Operators must be familiar with the processing process and operation specifications, and strictly follow the drawings, processes and technical standards to ensure product quality. Safety protection: During the nickel flange processing, pay attention to safety protection measures to avoid safety accidents.
Nickel flange basic parameter table display
| Grade: Flange |
standard: ASTM/ANSI, ISO, JIK, GB, ASTM A351, BS ANSI and DIN SGS approved ASME B16.30,NPT/BSPT |
| Length: as resquest | Width: as resquest |
| Place of Origin: Shandong, China | Brand Name: Hongye steel |
| Model Number: DN100,20K SOH-A 100A or customized | Type: WN,SO,BL,LJ,etc |
| Application: Air Condition Or Refrigerator Crystallizer | Tolerance: ±1% |
Nickel flange product details


Certifications and services we can provide
1. Product quality certificate, original Zhenan product test report;
2. Meet various packaging requirements of customers
3. If the customer raises an objection within 30 days after receiving the goods, we will provide you with return and exchange services
4. The fastest delivery speed
5. Free samples
FAQ About ZhenAn
1.Q: What are your advantages?
Honest business, competitive prices, professional service in export process.
2.Q: How do we ensure quality?
Always provide pre-production samples before mass production; always conduct final inspection before shipment;
3.Q: Do you have a stable supply of raw materials?
Maintaining long-term cooperation with qualified raw material suppliers ensures the high quality of our products from the first step.
4.Q: How is your quality control?
Our quality control steps include:
(1) Confirm everything with customers before purchasing and production;
(2) Check all materials to ensure they are correct;
(3) Hire experienced workers and train them properly;
(4) Conduct inspections throughout the production process;
(5) Conduct final inspection before loading.









