Post-processing of zirconium wire processing
Annealing treatment: In order to eliminate the internal stress generated during processing and improve the toughness and ductility of zirconium wire, annealing treatment is usually required after processing. The annealing temperature and time need to be adjusted according to the specific material and processing conditions.
Coating treatment: In some cases, in order to further improve the corrosion resistance or radiation resistance of zirconium wire, a protective layer such as oxide coating or other alloy coating can be coated on its surface.
Zhenan Zirconium Wire Product Parameter Table Display
|
Density |
g/cm3 |
6.51 |
|
Melting range |
°C |
1852 |
|
Thermal conductivity |
W/(m°K) |
22.7 |
|
Specific heat |
J/kg•°C |
275 |
|
Electrical resistivity |
ohm -cm |
397e-005 |
|
Modulus of elasticity |
GPa |
99.2 |
|
Poisson ratio |
|
0.35 |
|
Coefficient of expansion |
|
5.89 x 106 |
Zhenan Zirconium Wire Product Details Picture Display


Why choose us?
1.Provide competitive price for you.
2.We have our own factories and production teams over other suppliers.
3. Reliable quality on the base of the same price.
4. Delivery meet your requirements
5 Generally speaking ,we can supply from stock.
6.Do our best to meet the customer requirements.
If you have any questions or need any help ,please text us at any time.
FAQ About ZhenAn
Q: What information should I let you know if i want to get a quotation?
A: The required material dimension (Thickness*Width*Length,diameter*length; if possible, please kindly supply us drawings).
The required more information, such as Surface Condition, Tolerance Request, The Quantity, and other mechanical and technical details.
If it is possible, please also provide the application of products, we will recommend the most suitable products with details for confirmation.
Q: How do you gurantee the quality of the products?
A: Each step of production and finished products will be carried out inspection by QC department before storing in the warehouse. NG goods are not allowed in the completed goods warehouse.









