Tantalum plate packaging precautions
Choose appropriate packaging materials
Tantalum plates need to be carefully packaged using bubble bags, pearl cotton, antistatic bags, and vacuum bags to prevent squeezing and collision during transportation.
Antistatic packaging
Static electricity may damage tantalum plates, so antistatic packaging methods such as antistatic bags or other antistatic measures are required during packaging.
Moisture-proof packaging
Before packaging, the surface of the tantalum plate should be cleaned and dried, and sprayed with three-proof paint to prevent the tantalum plate from being damaged by a humid environment.
Anti-vibration packaging
Put the packaged tantalum plate in an antistatic packaging box. When placed vertically, no more than two layers should be stacked upwards. A stop plate should be placed in the middle to keep it stable and prevent shaking.
Zhenan Tantalum Plate Product Parameter Performance Table Display
|
Model Number |
Ta1 |
|
Application |
Industrial |
|
Shape |
square |
|
Material |
Tantalum |
|
Chemical Composition |
99.95% Tantalum |
|
Product name |
Tantalum sheet |
|
Size |
Accept Custom |
Zhenan Tantalum Plate Product Details Picture Display


Zhenan's services:
1. Customized according to your requirements and provide you with a valid quotation.
2. We have professional engineers to design solutions for you.
3. Our team will provide professional advice and assistance for your entire project.
4. Our factory welcomes on-site inspections at any time.
5. Ensure high-quality after-sales service.
FAQ About ZhenAn
Q1. Do you provide samples ? is it free?
Free sample will be offered, but the express fee will be paid by receiver.
Q2. Do you provide quality inspection?
Yes, our all goods can accepted SGS inspection, BV inspection, or any third party inspection specified by the clients.
Q3. How to make the payment?
We can accept Trade Assurance, Bank Transfer and LC at sight.
Q4. When will you deliver the goods?
For sample, in 1-3 working days after payment; For larger orders (by sea), in about 7-10 working days after payment.









