Introduction to the main production process of Zhenan tungsten rods
The preparation of tungsten rods requires a combination of powder metallurgy and plastic processing. The main steps include:
Powder preparation
Reduction method: Use hydrogen to reduce tungsten trioxide (WO₃) to obtain tungsten powder (purity ≥ 99.9%).
Alloying: Add elements such as molybdenum, rhenium, and thorium (such as ThO₂ to enhance high-temperature strength) and mix evenly.
Pressing and sintering
Cold isostatic pressing (CIP): Press tungsten powder into billets (density is about 50-70% of the theoretical density).
High-temperature sintering: Sintering at 1300-1500°C in a hydrogen atmosphere furnace, the density is increased to 90-95%.
Plastic processing
Forging/rolling: Forged into rods at a high temperature of 1200-1500°C, further increasing the density to more than 98%.
Drawing/polishing: Drawing through a die to a precise size (diameter can be as small as 0.1mm), surface roughness Ra≤0.8μm.
Post-processing
Annealing: Eliminate processing stress and improve plasticity (such as for filament materials that need to be bent).
Surface treatment: Electrolytic polishing or chemical cleaning to remove the oxide layer.
High purity tungsten rod product details
|
Tungsten content |
Type |
Diameter |
Dia.tolerance |
Length |
L tolerance |
Liner |
|
99.95% |
Sintering rod |
40-100 |
±3 |
2000max |
±5 |
±5% |
|
Froged rod |
20-80 |
±2 |
1500max |
±5 |
±2% |
|
|
Ground rod |
2-60 |
±0.1 |
1000max |
±1 |
±0.5% |
|
|
Application |
Be used for drawing tungsten wires, electrodes, heaters in high temperature vacuum furnace and so on. |
|||||
Round tungsten rod product details picture display


Zhenan's services:
1. Customized according to your requirements and provide you with a valid quotation.
2. We have professional engineers to design solutions for you.
3. Our team will provide professional advice and assistance for your entire project.
4. Our factory welcomes on-site inspections at any time.
5. Ensure high-quality after-sales service.
FAQ About ZhenAn
Q1. Do you provide samples ? is it free?
Free sample will be offered, but the express fee will be paid by receiver.
Q2. Do you provide quality inspection?
Yes, our all goods can accepted SGS inspection, BV inspection, or any third party inspection specified by the clients.
Q3. How to make the payment?
We can accept Trade Assurance, Bank Transfer and LC at sight.
Q4. When will you deliver the goods?
For sample, in 1-3 working days after payment; For larger orders (by sea), in about 7-10 working days after payment.