Notes on the production and processing of zirconium plates
Production and processing
The production process of zirconium plates includes multiple steps such as smelting, casting, hot rolling, cold rolling, etc. to ensure the dimensional accuracy and flatness of the final product.
During the processing, special attention should be paid to prevent oxidation and contamination, and the operation is usually carried out under a protective atmosphere.
99.5% High Purity zirconium alloy foil Product Detail Parameter Table
|
Term |
Zirconium plate |
|
Grade |
R60700,R60702,R60704-R60706 |
|
Dimension |
05-100(T)x900min(W)x2000min(L) |
|
Standard |
ASTM , JIS , DIN ASTM B352 ASTM B352 ASTM B551 |
|
MOQ. |
10kg |
|
Applications |
1.Chemical processing, medical instruments etc. 2.Aerospace,Indusrty,Navigation,Smelting,Chemical plants, and so on. |
|
Payment |
1. T/T, PAYPAL, Western union, 2.Prepaid 30% T/T against PI, pay for balance before delivery. |
|
Delivery time |
5 to 20days after confirmed |
Zhenan high purity zirconium plate product details picture display


We are your best and most assured choice:
1. Professional and timely pre-sales consulting team
2. One-to-one sales support team
3. Professional manufacturing team
4. Butler-style after-sales service team
FAQ About ZhenAn
1.Q: What are your advantages?
Honest business, competitive prices, professional service in export process.
2.Q: How do we ensure quality?
Always provide pre-production samples before mass production; always conduct final inspection before shipment;
3.Q: Do you have a stable supply of raw materials?
Maintaining long-term cooperation with qualified raw material suppliers ensures the high quality of our products from the first step.
4.Q: How is your quality control?
Our quality control steps include:
(1) Confirm everything with customers before purchasing and production;
(2) Check all materials to ensure they are correct;
(3) Hire experienced workers and train them properly;
(4) Conduct inspections throughout the production process;
(5) Conduct final inspection before loading.









